loading…
loading…
loading…
ENROLLED HB 5001, ENGROSSED 1 2024 LEGISLATURE ______________________________________________________________________________ SECTION 5 - NATURAL RESOURCES/ENVIRONMENT/GROWTH MANAGEMENT/TRANSPORTATION Expansion (HF 3644) (SF 3333)........................... 1,000,000 Palm Springs Village Congress Avenue Sewer Force Main (HF 1371) (SF 2836)......................................... 1,000,000 Palmetto Utility Infrastructure Improvements in Low/Moderate Income Area (HF 2909) (SF 1831)............ 2,500,000 Panama City Beach Restoration of Water Quality in Lullwater Basin (HF 1259) (SF 2898)..................... 1,500,000 Panama City Hentz Stormwater Park Repetitive Loss Project (HF 1652) (SF 3436)..................................... 950,000 Parkland Ranches Flooding Mitigation and Water Quality Improvement (HF 1147) (SF 2564)......................... 100,000 Peace River Manasota Regional Water Supply Authority Regional Transmission System Expansion (HF 3367) (SF 1137)................................................... 2,500,000 Pembroke Pines Utility Emergency Operations Center (HF 2685) (SF 2052)......................................... 400,000 Pensacola & Perdido Bays Estuary Program Restoration Initiative and Community Grant Program (HF 1437) (SF 3168)................................................... 750,000 Pinecrest Stormwater Improvements (HF 1721) (SF 1606)..... 350,000 Pinellas County Emergency Generators Replacement (HF 1880) (SF 2664)......................................... 1,000,000 Pinellas County Ridgecrest Neighborhood Water Quality Improvements Project (HF 2368) (SF 3594)................ 650,000 Pinellas Park Rehabilitating Master Station #30 and Replacing Force Main Phase 1 (HF 1114) (SF 1936)........ 800,000 Pinellas Park Water Quality Improvements - Fallingleaf, Foxmoor and Pinebrook North Ponds (HF 1694) (SF 2713)... 200,000 Polk Regional Water Cooperative Heartland Headwaters Protection and Sustainability........................... 2,614,387 Pompano Beach NW 16th Lane Stormwater Project (HF 1896) (SF 1006)............................................... 500,000 Port St. Lucie A14 Water Control Structure Improvements (HF 3047) (SF 2706)..................................... 262,500 Port St. Lucie Westport Wastewater Treatment Facility Nutrient Reduction Improvements (HF 2014) (SF 2705)..... 1,500,000 Punta Gorda Seawall Replacement and Mitigation (HF 2955) (SF 3051)............................................... 500,000 Putnam County - South Putnam Drainage (HF 3629) (SF 2457). 750,000 Putnam County Waste Water Treatment Expansion (HF 3630) (SF 2453)............................................... 4,200,000 River Park East Climate Resiliency Improvements - Stormwater improvements (SF 3497)...................... 3,000,000 Rockledge Advanced Water Treatment Phase 1 (HF 1466) (SF 2001)................................................... 2,500,000 Safety Harbor Water Main Replacement Project (HF 2242) (SF 2178)............................................... 1,000,000 Sanford Airport Authority - Midfield Economic Development Area Corridor Improvements (HF 3008) (SF 1882).......... 2,800,000 Sanford Nutrient Reduction at Lake Jesup and Lake Monroe (HF 3009) (SF 1883)..................................... 2,600,000 Sanibel - Replace Dune Walkovers From Hurricane Ian (HF 3161) (SF 3432)......................................... 2,000,000 Santa Rosa County Oriole Beach Drainage (HF 1434) (SF 1229)................................................... 500,000 Santa Rosa County Wastewater Treatment Package Plant I-10 Industrial Park (HF 3214) (SF 1228)..................... 3,000,000 Sarasota County Little Sarasota Bay Water Quality Improvement Project (HF 1375) (SF 3319)................. 500,000 Satellite Beach - Grand Canal and Finger Canals Muck Dredging (HF 2719) (SF 2006)............................ 3,000,000 Sebastian Inlet North and South Jetty Maintenance and Safety Improvements (HF 2621) (SF 2584)................. 1,000,000 Seminole County Septic to Sewer Conversion Phase 2 Wekiva Priority Focus Area (HF 1455) (SF 3540)................. 1,000,000 Sewall’s Point Road Reconstruction Phase 3 (HF 2134) (SF 3060)................................................... 500,000 South Bay Stormwater Flood Control and Waterway Management Phase 3 (SF 1084)........................... 180,000 South Daytona Sewer System Rehabilitation Pipelining (HF 2745) (SF 1007)......................................... 750,000 South Florida Conservancy District Specialized Canal Trash Truck (HF 3222) (SF 3565)......................... 400,000 South Miami Septic to Sewer Conversion Sub Area K (HF 2570) (SF 2331)......................................... 1,500,000 Southwest Ranches SW 163rd Avenue Drainage Improvement (HF 1541) (SF 1104)..................................... 435,080 286