loading…
loading…
loading…
ENROLLED HB 5001, ENGROSSED 1 2024 LEGISLATURE ______________________________________________________________________________ SECTION 5 - NATURAL RESOURCES/ENVIRONMENT/GROWTH MANAGEMENT/TRANSPORTATION St. Augustine - West Augustine Septic to Sewer 24/25 Four Mile Road Area (HF 3323) (SF 2485)...................... 5,000,000 St. Augustine Beach Mickler Boulevard Ditch Erosion Mitigation/Infrastructure Resiliency (HF 3325) (SF 2459) 3,863,128 St. Augustine Beach Mizell Stormwater Treatment Facility Improvements (HF 3327) (SF 2460)........................ 2,000,000 St. Augustine Beach Oceanside Circle Roadway Resiliency/Floodwater Mitigation System (HF 3328) (SF 2461)................................................... 1,500,000 St. Augustine Beach Ponds 400/500 and Associated Infrastructure Improvements (HF 3326) (SF 2458)......... 1,500,000 St. Lucie Village Septic to Sewer Phase 3 Design (HF 1358) (SF 2594)......................................... 293,670 St. Pete Beach - Resilient Stormwater Outfall Structures (HF 2423) (SF 2719)..................................... 625,000 St. Petersburg North Shore Park Shoreline Revitalization (HF 2509) (SF 3692)..................................... 550,000 Starke By-Pass Economic Development Corridor Project (HF 3405)................................................... 500,000 Stuart Sewer Connection Assistance (HF 1053) (SF 1154).... 500,000 Sunny Isles Beach Bella Vista Bay Park Seawall (HF 3109) (SF 2000)............................................... 750,000 Suwannee County Industrial Complex - Sewer Plants (HF 3498) (SF 2222)......................................... 1,109,000 Suwannee County Industrial Complex Elevated Water Tank (HF 3496) (SF 2218)..................................... 1,000,000 Sweetwater Roadway and Drainage Improvements (HF 2725) (SF 1736)............................................... 500,000 Talquin Water and Wastewater - Wakulla County Well Sites (HF 3506) (SF 2262)..................................... 875,000 Tamarac Canal Culvert Gate and Aluminum Headwall Improvements (HF 2375) (SF 2009)........................ 451,081 Tampa - Palmetto Beach Neighborhood Protection and Living Shoreline Enhancement (HF 3282) (SF 3195)............... 1,000,000 Tampa Bay Watch Living Shoreline and Water Quality Improvements (HF 2426) (SF 3194)........................ 1,100,000 Tampa Bay Water - Surface Water Treatment Plant Expansion (HF 3753) (SF 1908)..................................... 1,000,000 Umatilla Central Avenue Force Main Capacity Improvement (HF 1050) (SF 1358)..................................... 1,127,229 University of Central Florida - Restore Lagoon Inflow Final Phase (HF 2394) (SF 2195)......................... 4,900,000 Venice Intercoastal Waterway Second Force Main (HF 1376) (SF 3035)............................................... 750,000 Virginia Gardens Village Phase II Central Drainage Improvements (HF 3146) (SF 1711)........................ 700,000 Virginia Gardens Village Pump Station Rehabilitation Storm Water Master Plan GIS Update (HF 3145) (SF 1712).. 300,000 Warner University Wastewater Treatment Facility - Final Phase (HF 1005) (SF 3099)............................... 1,125,000 West Melbourne Flood Risk Reduction - Technology Drive (SF 2071)............................................... 150,000 West Melbourne Flood Risk Reduction Connect Canal 70 to Canal 63 (HF 1841) (SF 1986)............................ 400,000 West Miami Potable Water System Improvements Phase V (HF 2529) (SF 1160)......................................... 1,000,000 Weston Wastewater Lift Stations Hardening and Rehabilitation (HF 1840) (SF 1412)...................... 550,000 Wildwood Regional Water Reclamation Facility - Biological Nutrient Removal and Capacity Expansion Improvements (HF 1361) (SF 2318)..................................... 2,000,000 Windermere Water Master Plan North Phase (HF 3346) (SF 1372)................................................... 2,396,400 Winter Park Chain of Lakes Nutrient and Hydrologic Study (HF 1460) (SF 1546)..................................... 250,000 Winter Springs Stormwater Retrofit Study Phase 1 (HF 2414) 375,000 Zephyrhills Septic to Sewer Southside Transmission Line Upgrades (SF 1628)..................................... 1,550,000 Zolfo Springs - Wastewater Collection System Sanitary Sewer Evaluation Study (SSES) (SF 3091)................ 450,000 Zoological Society of the Palm Beaches Inc. Zoo Wetlands & Ecosystem Habitat Restoration (HF 2075) (SF 3473)..... 750,000 The nonrecurring funds in Specific Appropriation 1732A appropriated to the Department of Environmental Protection for the Polk Regional Water Cooperative Heartland Headwaters Protection and Sustainability are provided for the purpose of entering into financial assistance 287