loading…
loading…
loading…
ENROLLED HB 5001, ENGROSSED 1 2024 LEGISLATURE ______________________________________________________________________________ SECTION 5 - NATURAL RESOURCES/ENVIRONMENT/GROWTH MANAGEMENT/TRANSPORTATION for NW 39 St From NW 29 Ave to NW 30 Ave (HF 2836) (SF 2846)................................................... 250,000 Miami-Dade Park Flood Mitigation and Infrastructure Improvements (HF 2627) (SF 3648)........................ 3,000,000 Miramar Citywide Canal Embankment Improvements (HF 2412) (SF 1834)............................................... 350,000 Naples Bay Red Tide Septic Tank Mitigation (HF 2675) (SF 3494)................................................... 1,000,000 Naples Gulf of Mexico Stormwater Improvement Project (HF 2676) (SF 3492)......................................... 25,000,000 Naples Stormwater Lake Restoration Improvements (HF 2673) (SF 3501)............................................... 1,500,000 Neptune Beach Stormwater Improvements (HF 3536) (SF 2025). 500,000 New Smyrna Beach North Atlantic Drainage (HF 2770) (SF 1400)................................................... 837,500 Newberry Regional Advanced Wastewater Treatment Facility (HF 3720) (SF 2070)..................................... 500,000 Niceville Reclaimed Water Pipeline Project (HF 1078) (SF 2955)................................................... 3,000,000 North Bay Village Island Wastewater Pump Station Phase III (HF 2135) (SF 1876)................................. 425,000 North Miami Beach Emergency Generator Replacement for Water Treatment Facility (HF 3648) (SF 2670)............ 125,000 North Miami Flood Mitigation Project at NE 3rd Court (HF 3658) (SF 2674)......................................... 400,000 North Miami NE 121st Street Drainage Improvements (HF 3652) (SF 2672)......................................... 150,000 North Port Blue Ridge Salford Neighborhood Water and Sewer Expansion Phase II (HF 3382) (SF 1870)............ 1,000,000 Oak Hill Stormwater Ditch Cleanup (HF 2268) (SF 2014)..... 500,000 Oakland - South Lake Apopka Septic To Sewer Initiative (HF 3341) (SF 2310)..................................... 650,000 Ocala Force Main Construction (HF 1203) (SF 1255)......... 500,000 Ocala Lower Floridan Aquifer Conversion Phase V-A (HF 1205) (SF 1253)......................................... 250,000 Ocala Sewer Ex-Filtration Project (HF 1204) (SF 1254)..... 250,000 Ocean Conservancy - Improving Tampa Bay Water Quality, Fisheries, and Wildlife through Nutrient Fingerprinting (HF 3288) (SF 2843)..................................... 295,250 Ocean Ridge Water Valve Project (HF 2645) (SF 2432)....... 250,000 Okaloosa County Lloyd Street Mayflower Area Stormwater Improvements (HF 2139) (SF 2977)........................ 1,500,000 Okeechobee County Berman Road Stormwater Improvements (HF 2221) (SF 2582)......................................... 2,000,000 Old Plantation Water Control District Stormwater Pump Stations Rehabilitation and Automation (HF 1578) (SF 1088)................................................... 500,000 One Rake At A Time Rainbow River Restoration Project (HF 3395) (SF 2058)......................................... 2,000,000 Orange County Lakes Bumby and Tyner Sediment Inactivation (HF 2363) (SF 2861)..................................... 220,300 Ormond Beach Stormwater Improvements (HF 3354) (SF 2445).. 225,000 Osceola County Whitted Neighborhood Water System (HF 1321) (SF 3240)......................................... 1,450,000 Oviedo West Mitchell Hammock Water Treatment Facility - Tank Construction (HF 2439) (SF 1880)................... 900,000 Palatka Potable Water Line Improvements (HF 3669) (SF 2465)................................................... 3,500,000 Palm Bay Indian River Lagoon Baffle Boxes Projects (HF 2617) (SF 2037)......................................... 750,000 Palm Bay Indian River Lagoon Water Quality Improvement Project - Baseflow and Pond Improvements (HF 2361) (SF 2007)................................................... 550,000 Palm Beach County Green Cay Phase 2 (HF 1291) (SF 1041)... 500,000 Palm Beach County Lake Worth Lagoon Seagrass Restoration Project Phase II (HF 1211).............................. 270,500 Palm Beach County Loxahatchee Slough Habitat Restoration Phase II (HF 1226)...................................... 90,000 Palm Beach Shores - Lake Worth Inlet/Singer Island Channel Dredging Project (HF 2299) (SF 3342)............ 1,000,000 Palm Coast Colbert/Blare Drainage Improvements (HF 3020) (SF 3657)............................................... 4,000,000 Palm Coast Rapid Infiltration Basin Land Acquisition (HF 3549) (SF 3332)......................................... 2,000,000 Palm Coast Regional Rapid Infiltration Basin Expansion (HF 3021) (SF 3261)..................................... 5,000,000 Palm Coast Wastewater Treatment Facility No. 1 Capacity 285