(d) Any public right-of-way or easements agreed to pursuant to subdivision (a) shall meet the following specifications:
(1) A public right-of-way over approximately an 80-foot wide strip of land starting at a point approximately 1450 feet east of the center line of De La Cruz Boulevard and running in a northerly direction from Montague Expressway approximately 2200 feet to a point 250 feet south of the northern boundary of the Camsi III property, the last 970 feet of which lies contiguous with the western boundary of the Camsi III property, together with land necessary for acceleration and deceleration lanes from the proposed collector street onto and off of Montague Expressway, the land consisting of two wedge shaped parcels, 600 feet in length and varying width, between 20 feet to 0 feet.
(2) A 20-foot wide easement for entry into state land, to fill an existing channel and install and maintain a water main, lying contiguous to the northern right-of-way line of Montague Expressway and running from the western boundary of Camsi III property, westerly to De La Cruz Boulevard, excepting that right-of-way previously described in paragraph (1) of this subdivision for the proposed street purpose.
(3) A 30-foot wide easement, for the purpose of filling an existing storm channel, running from Montague Expressway 441 feet northerly along the water boundary of Camsi III property.
(4) Other easements determined by the Director of General Services as necessary for the purpose of constructing a business development park pursuant to Section 14672.9 of the Government Code.