Virginia FAMIS MOMS and FAMIS Select Section 1115 Demonstration Demonstration Period: October 25, 2019 through June 30, 2029; Amended November 18, 2021 Page 20 of 61 The hypothesis testing should include, where possible, assessment of both process and outcome measures. Proposed measures should be selected from nationally-recognized sources and national measures sets, where possible. Measures sets could include CMS’ Core Set of Health Quality Measures for Children in Medicaid and CHIP, Consumer Assessment of Health Care Providers and Systems (CAHPS), the Initial Core Set of Health Quality Measures for Medicaid-Eligible Adults and/or measures endorsed by the National Quality Forum (NQF). The findings from each evaluation component must be integrated to help inform whether the Commonwealth met the overall demonstration goals, with recommendations for future efforts regarding all components.
36. Interim Evaluation Report. The Commonwealth must submit an Interim Evaluation Report for the completed years of the demonstration, and for each subsequent extension of the demonstration, as outlined in 42 CFR 431.412(c)(2)(vi). When submitting an application for extension, the Evaluation Report should be posted to the Commonwealth’s website with the application for public comment.
a. The Interim Evaluation Report will discuss evaluation progress and present findings to date as per the approved evaluation design.
b. For any demonstration authority that expires prior to the overall demonstration’s expiration date, the Interim Evaluation Report must include an evaluation of the authority as approved by CMS.
c. The Commonwealth must provide a draft Interim Evaluation Report for the corresponding years, no longer than one year after completion of the measurement period, as follows. The Commonwealth must submit a final Interim Evaluation Report for each measurement period 60 calendar days after receiving CMS comments on the draft Interim Evaluation Report and post the documents to the Commonwealth's website. i. An Interim Evaluation Report for the period of July 2019 through June 2022 will be due by no later than June 30, 2023. ii. An Interim Evaluation Report for the period of July 2019 – June 2024 will be due by no later than June 30, 2025. iii. An Interim Evaluation Report for the period of July 2019 – June 2027 will be due by no later than June 30, 2028.
d. If the Commonwealth is seeking to extend the demonstration, the draft Interim Evaluation Report is due when the application for extension is submitted. If the Commonwealth made changes to the demonstration in its application for extension, the research questions and hypotheses, and how the design was adapted should be included. If the Commonwealth is not requesting a demonstration extension, an Interim Evaluation report is due one year prior to the end of the demonstration. For demonstration phase-out prior to the expiration of this demonstration approval period, the draft Interim Evaluation Report is due to CMS on the date that will be specified in the notice of termination or suspension.