135.44 Good Cause Review Date
At the review date, the CAO will determine if:
Good cause should continue; or
The individual can participate for some or all of the required hours.
If it is determined that an individual can participate, the CAO will:
Refer the individual to the most appropriate E&T activity;
Update the AMR;
Update eCIS to close the A project and remove the good cause code; and
Narrate the circumstances why the good cause was no longer needed.
Updated January 20, 2026, replacing April 11, 2013