Page 224
Oklahoma Statutes - Title 40. Labor Page 224 rules and regulations, and until said certificate of operation shall have been reinstated. Added by Laws 1982, c. 252, § 14.
§40-141.15. Certificate of operation required - Violations. After twelve (12) months for power boilers, twenty-four (24) months for low pressure steam heating, hot water heating and hot water supply boilers, and thirty-six (36) months for pressure vessels following the date on which this act becomes effective, it shall be unlawful for any person, firm, partnership or corporation to operate in this state a boiler or pressure vessel covered by this act, including boilers and pressure vessels covered by owner-user inspection service provided for in Section 14, without a valid certificate of operation. The operation of a boiler or pressure vessel without such certificate of operation, or at a pressure exceeding that specified in such certificate of operation or in violation of this act or the rules and regulations promulgated under it, shall constitute a misdemeanor on the part of the owner, user or operator thereof. Each day of such unlawful operation shall be deemed a separate offense. Added by Laws 1982, c. 252, § 15.
§40-141.16. Fees - Department of Labor Revolving Fund A. The Commissioner of Labor may promulgate rules establishing a schedule of administrative fees for the registration, inspection and operation of boilers, pressure vessels and steam lines. The following fees shall remain in effect until rules become effective, at which time the fees contained in this subsection shall be superseded by rule. Fees collected by the Department of Labor for the registration, inspection and operation of boilers, pressure vessels and steam lines shall be deposited as provided in subsection C of this section. 1. a. Annual certificate of operation fee shall be as follows: (1) with manway state inspector $75.00 (2) without manway state inspector $50.00 (3) any size special - or owner/user inspector $50.00 (4) each public hot water supply heater (biennially) $5.00 (5) each public boiler inspection/certification $25.00 b. Only one certificate of operation fee per year may be charged; except an additional fee equal to the certificate of operation fee may be charged for witnessing a hydrostatic test required after repairs, provided a fee equal to the total fees identified in