002.02(C)(i)(1) EXPEDITED VERIFICATION.
If the household fails to provide the required postponed verification(s) by the end of the expedited issuance benefit month, the benefits for the second issuance will not be issued. If the household provides the required postponed verification(s) before the end of the second month of the certification period, the benefits will be provided for the second month and for the remainder of the original certification period without a new application. Benefits will not be prorated.