Page 578
Revised 12-01-17
TIME FRAME FOR HANDLING CHANGES Changes in the recipient's situation come to the attention of the Economic Assistance Office not only through regular redeterminations but also through reports from the recipient, the Income Eligibility Verification System (IEVS), quality control, people in the community, and other sources. The worker must follow up on all information received through IEVS and on any information which represents a change that has a bearing on eligibility. Once the change is reported, the worker will have 10 days to request information when verification is required and then 10 days to take action on the change once the information is received. The required change in status should be made at the next possible payroll date after the change occurs and the facts have been established. The next possible payroll on which action can be taken will be: 1. The next month after the change occurred and facts have been established when: a. The change is a grant increase or procedural change, such as transfer of children, transfer between counties, change in name or address, or technical change. If rollover has occurred when the change resulting in an increase is processed, it will be necessary to issue a supplement for the next month. See Volume X for instructions. b. The change is a reduction or closure action which does not require advance notice.
c. The change requires an advance notice but the ten-day advance period will expire prior to the first of the month for which action is desired and the individual does not request a hearing within the ten-day period. If the change is a closure and the case is in FROZEN STATUS in MAVERICS at rollover, the system will not transmit the benefit information to the EPPIC system if the ten days of the FROZEN STATUS period will expire on or prior to the last day of the current calendar month. However, if the individual supplies information which changes the decision to close the case or if the individual requests a hearing on a matter other than general agency policy or law, the worker should take steps in MAVERICS to authorize a correct or continuing benefit for the following month.
This procedure will change the case STATUS to OPEN, and the benefit will be transmitted to the EPPIC system. Volume III | Chapter 7 NOTE: If the case is in FRozen status because of a pending TWP conciliation when the
change report is received, the TWP conciliation must be handled before any other changes can be made. 7553