Page 213
COMBINED MANUAL
ISSUE DATE 12/2014
DELAYS CAUSED BY THE AGENCY AND APPLICANT
0005.12.15.15
MFIP, DWP, MSA, GA, GRH: No provisions.
SNAP: When the delay was the applicant's fault during the 1st 30 days, and the agency's fault for the 2nd 30 days, do not issue benefits for the 1st 30-day period. Do not require a new application.
Issue benefits in the 2nd 30-day period from the date the client takes the required action to complete the application.
If the delay beyond the 2nd 30-day period is the applicant's fault, deny the application. This applies even if the delay during the 1st 30 days was the agency's fault.