TEAMKY Demonstration
Approval Period: January 1, 2025 through December 31, 2029
Page 71 of 155 105. Evaluation Budget. A budget for the evaluation must be provided with the draft Evaluation Design. It will include the total estimated cost, as well as a breakdown of estimated staff, administrative and other costs for all aspects of the evaluation such as any survey and measurement development, quantitative and qualitative data collection and cleaning, analyses and report generation. A justification of the costs may be required by CMS if the estimates provided do not appear to sufficiently cover the costs of the design or if CMS finds that the design is not sufficiently developed, or if the estimates appear to be excessive.
106. Interim Evaluation Report. The state must submit an Interim Evaluation Report for the completed years of the demonstration, and for each subsequent renewal or extension of the demonstration, as outlined in 42 CFR 431.412(c)(2)(vi). When submitting an application for extension of the demonstration, the Interim Evaluation Report should be posted to the state’s Medicaid website with the application for public comment.
a. The Interim Evaluation Report will discuss evaluation progress and present findings to date as per the approved Evaluation Design.
b. For demonstration authority of any components within the demonstration that expire prior to the overall demonstration’s expiration date, and depending on the timeline of expiration/phase-out, the Interim Evaluation Report must include an evaluation of the authority, to be collaboratively determined by CMS and the state.
c. If the state is seeking to extend the demonstration, the draft Interim Evaluation Report is due when the application for the extension is submitted, or one year prior to the end of the demonstration, whichever is sooner. If the state made changes to the demonstration in its application for extension, the research questions and hypotheses, and a description of how the design was adapted should be included. If the state is not requesting an extension for a demonstration, an Interim Evaluation Report is due one (1) year prior to the end of the demonstration. For demonstration phase outs prior to the expiration of the approval period, the draft Interim Evaluation Report is due to CMS on the date that will be specified in the notice of termination or suspension.
d. The state must submit the revised Interim Evaluation Report 60 calendar days after receiving CMS’s comments on the draft Interim Evaluation Report, if any, e. Once approved by CMS, the state must post the document to the state’s Medicaid website within 30 calendar days.
f. The Interim Evaluation Report must comply with Attachment L (Preparing the Interim and Summative Evaluation Report) of these STCs.
107. Summative Evaluation Report. The state must submit to CMS a draft Summative Evaluation Report for the demonstration’s current approval period within 18 months of the end of the approval period represented by these STCs. The draft Summative Evaluation Report must be developed in accordance with Attachment M (Preparing the Interim and