Page 10
When a change results in positive action or increases the level of benefit, including the addition of a mandatory AG member, the effective date of the change is the month following the month the change was verified. If the Eligibility System does not form the new benefit of as of the first following month, then the case should be reviewed for a possible fiat or override.
Positive changes are changes that will increase the level of benefits and include verification that a member moved into a nursing facility, reductions in income and additions to the household. If a reported change is received stating that a member moved into a nursing facility, this is considered a verified change. If all other eligibility criteria are met (including the data gathering interview, all verifications received etc.), then the MA D category change will take place going forward to the next month.
Example 1: On 03/01, a healthcare application is received for a disabled applicant; the applicant does not receive SSDI or SSI and there is no MRT determination. The applicant/AR is requesting dual processing for HIP and MA D.
On 03/15, the HIP is approved, and the POWER account is paid; the HIP is open 03/01.
On 03/27, verification that the member moved into a nursing facility is received, but the case is still pending a disability determination. On 04/02, MRT approves the MA D, and the case is authorized. Due to adverse timeframes, the HIP is ending 04/30 and the MA D is opening 05/01, but because the reported change of residing in a nursing facility was received 03/27, then the MA D should open 04/01. In this situation, the worker sets up an override /fiat to end the HIP effective 03/31 so a fiat or override can be completed for MA D starting 04/01. The HIP will remain in place for the month of March.
Example 2: On 03/01, a healthcare application is received for a disabled applicant; the applicant does not receive SSDI or SSI and there is no MRT determination. The applicant has a pending waiver application. The applicant/AR is requesting dual processing for HIP and MA D.
On 03/15, the HIP is approved, and the POWER account is paid; the HIP is open 03/01. The waiver approval is received 03/25, and on 04/27, MRT approves the MA D.
Due to adverse timeframes, the HIP is ending 05/31 and the MA D is opening 06/01, but because the waiver approval was received 03/25, then the MA D should open 04/01. In this situation, a fiat or override can be completed for MA D starting 04/01.