Page 29
Iowa LIHEAP Policy and Procedures Manual
8.00 Documentation and Recordkeeping Requirements
Effective 09/01/2023
Page | 23
● Deliverable Fuel Vendors (NOT prepaid) o Deliverable Fuel Vendor Agreement o Vendor Tax ID Number o Price list of routine services o Receipt of funds documentation o Sam.gov search saved electronically in file (see Section 12.30 for more information)
● Prepaid Deliverable Fuel Vendors o Prepaid Deliverable Fuel Vendor Agreement o Vendor Tax ID Number o Price list of routine services o Receipt of funds documentation o Deliverable Fuel Prepaid Account Reconciliation Spreadsheet o Sam.gov search saved electronically in file (see Section 12.30 for more information
● Water Vendors o Water Vendor Agreement o Vendor Tax ID Number o Receipt of funds documentation o Sam.gov search saved electronically in file (see Section 12.30 for more information) o Landlord Verification Form for Renters o Non-Essential Service waiver, if applicable
8.40 HVAC Contractor Files The Iowa LIHEAP program is required to use Iowa Weatherization Program approved HVAC contractors when a heating or central air conditioning repair or replacement is needed, using ECIP funds. Approved contractor files (typically maintained by the CAA’s Weatherization Program) must contain the documentation listed below.
● Contract between the CAA and the contractor ● System Award Management (https://sam.gov) search saved electronically (performed each time contract renewed) ● Current Iowa Contractor Registration Certificate (contractors must renew yearly with IWD) ● Commercial General Liability Insurance ($500,000/per occurrence and $1 million aggregate) ● Automobile Insurance (coverage amount as deemed sufficient by agency) ● Workers’ Compensation Insurance (or waiver – signed at beginning of each new contract) ● Electrical License (as applicable) ● Current Plumbing & Mechanical License (as applicable) ● Lead Renovator Certification (waived if replacing a heating unit with no new ductwork) ● Lead Firm Certification
Refer to the Iowa Weatherization Program Policy and Procedures Manual for more information regarding contractor file requirements.
8.50 Outreach Offices/Intake Sites Each outreach office and intake site must post the documentation below.
● Appeal and Hearing Procedure must be posted at each intake site ● Hours and days of application intake must be clearly posted