Page 215
State Plan Checklist - MANAGEMENT INFORMATION SYSTEM 8/14/2026 Page 17
C. WIC Systems Functional Requirements Checklist 246. 4(a)(8); (9); (11); (12); (13); (14); (15); and (18): Describe those functions which are currently incorporated into the MIS or which are planned to be incorporated in the future. The following checklists were taken from the WIC Functional Requirements Document (FRED) which is provided as guidance to State agencies on functions they should consider incorporating into their Information Systems. Please check those functions/capabilities which the State agency system currently performs or plans to perform within the next two years.
State Agency System Performs State Agency System Planned Automated Core Fun ction/Capabilities X 1. Calculates the date certification is due to expire. X 2. Assigns the participant a nutritional risk code and assigns a priority level. (CPA confirms the code is correct.) 2a. Assigns one risk code. 2b. Assigns up to 3 risk codes.